News
Center
资讯中心
Chinese Company
中国企业
Related Companies
相关企业
Longji Precision Control Suzhou Intelligent Manufacturing Base officially opened
隆基精控苏州智能制造基地正式启用
2026-10-15
来源:隆基绿能
作者:隆基绿能
On October 9th, Longi Precision Control Intelligent Manufacturing Base was officially opened in Suzhou High tech Zone. The base covers an area of approximately 66 acres and will undertake the manufacturing, testing, quality inspection, and delivery of global industrial, commercial, and public energy storage products.

The opening of the new base will further improve the large-scale manufacturing and global delivery system of LONGi Energy Storage. At the same time, as an important milestone in the implementation of the "Full Stack LONGi ONE" strategy, it will accelerate the integration of LONGi's optical storage system and provide solid support for global business development.

With the development of the energy storage market towards scale and multi scenario, manufacturing capability has become an important guarantee for product quality, project delivery, and long-term operation. The new base will be based on lean management, deeply integrating digital operations and intelligent applications, and continuously improving manufacturing efficiency, quality level, and delivery reliability.



10月9日,隆基精控智能制造基地在苏州高新区正式启用。该基地占地约66亩,将承担全球工商业及公共事业级储能产品的制造、测试、质检与交付。

新基地的启用,将进一步完善隆基储能规模化制造与全球交付体系,同时作为“全栈隆基 LONGi ONE”战略落地的重要里程碑,将加速隆基光储系统融合、为全球业务发展提供坚实保障。

随着储能市场向规模化、多场景发展,制造能力已成为产品质量、项目交付与长期运营的重要保障。新基地将以精益管理为基础,深度融合数字化运营与智能化应用,持续提升制造效率、质量水平与交付可靠性。



High quality production capacity, consolidating the foundation for large-scale delivery

It is reported that the new base will focus on three major product directions: large-scale storage, industrial and commercial, and off microgrid energy storage, accelerate the construction of multi product line production capacity, and form a manufacturing layout covering different application scenarios.

Among them, the large-scale storage integrated production line is planned to form an integrated manufacturing capacity of 31GWh/year in October 2026, and further expand production to 50GWh/year in the first half of 2027; The industrial and commercial energy storage production line is planned to reach an annual production scale of over 10000 units by the end of October. In addition, the base has also laid out off microgrid energy storage production lines to further meet the product needs of different markets and application scenarios.



优质产能,夯实规模化交付底座

据悉,新基地将围绕大储、工商业及离微网储能三大产品方向,加快推进多产品线产能建设,形成覆盖不同应用场景的制造布局。

其中,大储集成产线计划于2026年10月形成31GWh/年的集成制造能力,并于2027年上半年进一步扩产至50GWh/年;工商业储能产线计划于10月底达到年产1万台以上的生产规模。此外,基地还布局离微网储能产线,进一步满足不同市场和应用场景的产品需求。



From product line layout to capacity expansion, the new base will continue to enhance the manufacturing and delivery capabilities of multi scenario energy storage products, providing support for the large-scale implementation of global projects.

Driven by digital intelligence, creating an efficient manufacturing system

At the beginning of the planning of the new base, digitization and intelligence were identified as important directions for upgrading Longi's energy storage manufacturing capabilities. In terms of digital operations, the base will complete the full upgrade and deployment of MES system in November, build a "MES+BI+AI=MOM" lightweight manufacturing operation management platform, connect core businesses such as ERP, WMS, RCS, etc., achieve automatic issuance of production plans, full chain traceability of materials, real-time monitoring of equipment operation efficiency, and visualization of QCDSM lean indicators.



从产品线布局到产能规模提升,新基地将持续增强多场景储能产品的制造与交付能力,为全球项目的规模化落地提供支撑。

数智驱动,打造高效制造体系

在新基地规划之初,数字化与智能化即作为隆基储能制造能力升级的重要方向。在数字化运营方面,基地将在11月完成MES系统全量升级部署,构建“MES+BI+AI=MOM”轻量化制造运营管理平台,打通ERP、WMS、RCS等核心业务,实现生产计划自动下发、物料全链路追溯、设备运行效率实时监控,以及QCDSM精益指标可视化。



Relying on the manufacturing and operation control tower, the base further promotes full process transparency and control, and improves material distribution and equipment management efficiency through AGV intelligent scheduling, digital warehousing, and iTPM equipment predictive maintenance. Digital quality closed-loop management will shorten the closed-loop time of quality issues by more than 50%.

On this basis, the base will also focus on promoting three major AI application scenarios: intelligent process execution, intelligent quality inspection, and intelligent device operation and maintenance. The ESOP electronic process guidance execution accuracy can reach over 99%, the quality inspection efficiency can be improved by 5-10 times, the defect omission rate can be controlled within 0.1%, the fault investigation time can be shortened by more than 60%, and the downtime loss caused by faults can be reduced by 75%.

Light storage integration supports global energy transformation



依托制造运营控制塔,基地进一步推进全流程透明化管控,并通过AGV智能调度、数字化仓储及iTPM设备预测性维护,提升物料配送与设备管理效率。数字化质量闭环管理将推动质量问题闭环时间缩短50%以上。

在此基础上,基地还将重点推进智能工艺执行、智能质量检测、智能设备运维三大AI应用场景,ESOP电子工艺指导执行准确率可达99%以上,质检效率提升5-10倍、不良品漏检率控制在0.1%以内,故障排查时间缩短60%以上、故障停机损失降低75%。

光储融合,支撑全球能源转型



The official opening of the new base is not only an upgrade of LONGi's energy storage manufacturing capabilities, but also an important measure for LONGi to accelerate the integration of optical storage systems and implement the "Full Stack LONGi ONE" strategy.

At the opening ceremony, She Haifeng, General Manager of Longi Precision Control, stated that the core of the combination between Longi and Precision Control lies in the complementary capabilities of both parties in the fields of "light" and "storage". Based on the "LONGi ONE" optical storage integration strategy, LONGi Precision Control will further promote the integration of optical storage from equipment combination to system integration. Through unified design, control, platform, and service, it will continuously improve the security, efficiency, and intelligence level of the system, and create better full lifecycle value for customers.

Facing the world, Longi Precision Control will continue to carry out research and development innovation around the safety, efficiency, lifespan, and intelligence of energy storage systems, and improve product quality and delivery reliability through advanced manufacturing, digital management, and quality system construction. At the same time, relying on Longi's global market, channels, and service system, we will accelerate our layout in key markets such as Europe, North America, Asia Pacific, and the Middle East, and continue to improve our localized sales, technical support, project delivery, and service capabilities.



新基地的正式启用,不仅是隆基储能制造能力的升级,也是隆基加速推动光储系统融合、落实“全栈隆基 LONGi ONE”战略的重要举措。

隆基精控总经理佘海峰在启用仪式上表示,隆基与精控的结合,核心在于双方在“光”与“储”领域的能力互补。基于“全栈隆基 LONGi ONE”光储融合战略,隆基精控将进一步推动光储从设备组合走向系统融合,通过统一设计、统一控制、统一平台和统一服务,持续提升系统的安全性、效率与智能化水平,为客户创造更优的全生命周期价值。

面向全球,隆基精控将持续围绕储能系统安全、效率、寿命与智能化开展研发创新,以先进制造、数字化管理和质量体系建设提升产品质量与交付可靠性。同时,依托隆基全球市场、渠道和服务体系,加快欧洲、北美、亚太、中东等重点市场布局,持续完善本地化销售、技术支持、项目交付与服务能力。



(Using AI translation)

(使用AI翻译)